Miele PDR 522 TOP Installation Plan

Tip
Installation Plan

Bu kılavuz için de uygundur

PDR922/522 EL
Electrically heated
en Installation plan Commercial dryer
cs Instalační plán Profesionální sušičky
hu Telepítési terv Ipari szárítógép
pl Plan instalacyjny Suszarka profesjonalna
pt Plano de instalação Secadores industriais
tr Kurulum planı Endüstriyel Kurutma Makinesi
M.-Nr. 11 865 950
2
en ...................................................................................................................................... 03
cs ....................................................................................................................................... 13
hu ...................................................................................................................................... 23
pl ....................................................................................................................................... 33
pt ....................................................................................................................................... 43
tr ........................................................................................................................................ 53
en - Contents
3
Installation notes............................................................................................................. 4
Installation requirements ................................................................................................... 4
Electrical connection......................................................................................................... 4
Air intake/exhaust air......................................................................................................... 5
PDR922/522, electrically heated ................................................................................... 6
Dimensions........................................................................................................................ 6
Installation ......................................................................................................................... 7
Installation (standard/on concrete plinth).......................................................................... 8
Installation (offshore) ......................................................................................................... 9
Technical data.................................................................................................................. 10
Voltage variants and electrical data .................................................................................. 10
Voltage variant 1............................................................................................................ 10
Voltage variant 2............................................................................................................ 10
Exhaust air......................................................................................................................... 10
Air intake............................................................................................................................ 10
Equipotential bonding (optional)........................................................................................ 10
Peak-load negotiation (optional)........................................................................................ 11
Machine data..................................................................................................................... 11
Fixing options.................................................................................................................... 11
Fixing without plinth ...................................................................................................... 11
Fixing to concrete plinth................................................................................................ 12
Options/Accessories ......................................................................................................... 12
Concrete base (on site) ................................................................................................. 12
en - Installation notes
4
Installation requirements
Risk of injury or damage to property due to improper installa-
tion.
Incorrect installation of the tumble dryer can lead to personal injury
or damage to property.
The tumble dryer must only be installed and commissioned by
Miele Customer Service Department or an authorised dealer.
The tumble dryer must be installed in accordance with all relevant
regulations and standards.
The dryer must only be operated in a room that has sufficient vent-
ilation and which is frost-free.
The tumble dryer must not be installed behind a closeable door or
a sliding door. The maximum opening angle of the tumble dryer door
must not be limited by objects or doors. It must be possible to fully
open the tumble dryer door at any time.
Electrical connection
The electrical connection must be established by a qualified electri-
cian.
The electrical connection may only be made to an electrical system
provided in accordance with all appropriate local and national legisla-
tion, regulations and guidelines. Please also observe the regulations
set out by your insurance provider and energy supplier, accident pre-
vention regulations, as well as recognised codes of practice.
Reliable and safe operation of this tumble dryer is only ensured if it
has been connected to the mains electricity supply.
The required supply voltage, power rating and fuse rating can be
found on the data plate on the tumble dryer. Ensure that the supply
voltage matches the voltage quoted on the data plate before estab-
lishing the electrical connection to the tumble dryer.
Connection to a supply voltage other than the one quoted on the
data plate can damage the tumble dryer if the voltage is too high.
If more than one voltage is specified on the data plate, the tumble
dryer can be converted for connection to the relevant input voltage.
This conversion must be performed by the Miele Customer Service
Department or by an authorised dealer. During the conversion, the
wiring instructions given on the wiring diagram must be followed.
The tumble dryer can either be connected with a suitable plug-and-
socket in accordance with IEC60309-1, or where necessary a hard-
wired connection. For a hard-wired connection, an all-pole isolation
device must be available at the installation site.
en - Installation notes
5
An isolation device is a switch which ensures a contact opening of
more than 3mm. These include circuit breakers, fuses and contact-
ors (IEC/EN60947).
If the mains supply cannot be permanently disconnected, the isola-
tion device (including plug and socket) must be safeguarded against
being switched on either unintentionally or without authorisation.
Tip: We recommend connecting the tumble dryer to the power supply
via a plug and socket so that it is easier to conduct electrical safety
checks (e.g. during maintenance or repair work).
The tumble dryer must not be connected to devices such as timers
which would switch it off automatically.
If local regulations require that a residual current device (RCD) is in-
stalled, a typeB residual current device (sensitive to universal cur-
rent) must be used.
If local and national installation specifications require equipotential
bonding, good galvanic contact must be guaranteed. Equipotential
bonding must have an earth current rating >10mA.
Air intake/exhaust air
The tumble dryer may only be operated when the ducting has been
connected properly and the room is sufficiently ventilated.
Accessory parts may only be fitted when expressly approved by
Miele. If other parts are used, warranty, performance and product li-
ability claims will be invalidated.
en - PDR922/522, electrically heated
6
Dimensions
906
1057
>20
Ø 520
650
1400
900 642
1162
67
1064
1400
20
595 Ø 630
1600
45°
>20
1162
1057
1600
906
900
< 180°
38
Dimensions quoted in millimetres
en - PDR922/522, electrically heated
7
Installation
620 280
183
SLA
1342
305
1600
150
305
1600
~ 50
2 x
150
128
200
EL
AL ZL
PA
ZL
PA
EL
AL
128
SLA
PA
SLA
ZL
EL
AL
AL
ZL
161
160
"Z"
"Y"
"Y"
"Z"
XCI
96
31
Measurements in millimeters
EL Electrical connection
AL Exhaust duct
ZL Air intake
PA Connection for equipotential bonding (optional)
SLA Peak-load connection (optional)
XCI XCI Box/Connector Box (optional)
en - PDR922/522, electrically heated
8
Installation (standard/on concrete plinth)
20
1400
Ø 10
1400
BS
395
B
~ 48
55
1059
~ 55
>50
Ø 10
~ 55
B
1600
55
790
395
1066
900
534
BB
A
A
BS >1200
>55
BS >900
534
1066
B
B
BB
A - A B - B
>55
790
1600
~ 48
BS
>50
20
Dimensions quoted in millimetres
BDrill hole/anchor point
BS Concrete plinth
en - PDR922/522, electrically heated
9
Installation (offshore)
20
1400
M6 x 20
B
~ 48
55
1059
1600
55
790
900
963
463
534
BB
C
C
926
OFFSHORE
C - C
BB
395
103
Dimensions quoted in millimetres
BDrill hole/anchor point
en - Technical data
10
Voltage variants and electrical data
Voltage variant 1
Standard connection
Supply voltage 3N AC 400V
Frequency 50/60Hz
Power rating 23.5kW
Fuse rating (on site) 3×50A
Minimum cross-section for connection cable 5×10mm²
Cable gland M40
Voltage variant 2
Standard connection
Supply voltage 3 AC 230V
Frequency 50/60Hz
Power rating 23.5kW
Fuse rating (on site) 3×63A
Minimum cross-section for connection cable 4×16mm²
Cable gland M40
Exhaust air
Maximum nominal volume flow rate in extraction mode (PDR9xx
only)
960m³/h
Maximum nominal volume flow rate (PDR5xx only) 740m³/h
Maximum permitted pressure loss 350Pa
Connector on machine side (external diameter) 150mm
Connection pipe provided on site (internal diameter) 150mm
Maximum exhaust air temperature 80°C
As relative humidity inside the exhaust ducting can be as high as 100%, suitable measures must be taken to prevent a backflow of
condensate into the machine.
Air intake
Standard connection: air intake from installation site
Recommended free air intake cross-section into the room:
(equivalent to 3 times the exhaust air cross-section of a machine).
531cm²
There must be sufficient air intake to the installation site to match the air outlet volume.
Alternative connection: air intake connection directly from outdoors
Connection sleeve on machine side (internal diameter) 161mm
Connection pipe provided on site (external diameter) 160mm
Removing the protective cover exposes live parts. For safety reasons, a pipe must be installed from the tumble dryer’s central fresh air
intake (over a minimum length of 900mm) and secured with 2screws.
Equipotential bonding (optional)
Connection with male thread 10×35mm
Washers and nuts M10
Accessories for equipotential bonding are not supplied and need to be ordered separately.
en - Technical data
11
Peak-load negotiation (optional)
Supply voltage for control contacts AC 230V
Minimum cross-section for connection cable 5×1.5mm²
Miele recommends using a flexible connection cable with an additional isolation option to establish the connection. The isolator should
remain visible once the tumble dryer has been installed and must be freely accessible.
Machine data
Machine width, total 906mm
Machine height, total 1400mm
Machine depth, total 1162mm
Niche width 1250mm
Recommended wall spacing (up to the front edge of the machine) 1600mm
Minimum wall spacing (up to the back edge of the lid) 500mm
Packaging width 1090mm
Packaging height 1526mm
Packaging depth 1254mm
Maximum gross volume 2085.8l
Maximum gross weight 213.4kg
Maximum net weight 198.9kg
Max. floor load in operation 2275N
Diameter of exhaust duct 150mm
Drum diameter 850mm
Diameter of drum opening 520mm
Drum depth 742mm
Drum volume 400l
Diameter of door opening 520mm
Maximum door opening angle 180°
Emission sound pressure level 62 dB(A) re 20 µPa
Sound power level 70
Average heat dissipation rate into the room 2.6MJ/h
Permissible ambient temperature range 2–40°C
Fixing options
Fixing without plinth
Quantity Screw size
Tensioning strips 2
Wood screws DIN571 (Ø×length) 2 6×40mm
Plugs (Ø×length) 2 10×50mm
If the tumble dryer is being installed without a plinth, fixing it in place is recommended.
Fastenings for floating screed must be supplied by the customer on site.
en - Technical data
12
Fixing to concrete plinth
Quantity Screw size
Tensioning strips 2
Wood screws DIN571 (Ø×length) 2 6×40mm
Plugs (Ø×length) 2 10×50mm
If the tumble dryer is being fixed to a concrete plinth on site, fixing in place is absolutely essential.
Fastenings for floating screed must be supplied by the customer on site.
Options/Accessories
Concrete base (on site)
Minimum width 900mm
Recommended height 100mm
Minimum height 50mm
Minimum depth 1200mm
The quality of the concrete and its strength must be assessed according to the machine load. The on-site concrete plinth must be fixed
adequately to the floor.
cs - Obsah
13
Pokyny kinstalaci............................................................................................................ 14
edpoklady instalace ....................................................................................................... 14
Elektrické připojení............................................................................................................ 14
Přívod vzduchu/odtah ....................................................................................................... 15
PDR922/522, elektricky vytápěné ................................................................................. 16
Rozměry ............................................................................................................................ 16
Instalace ............................................................................................................................ 17
Umístění (standard/betonový sokl).................................................................................... 18
Umístění (offshore) ............................................................................................................ 19
Technické údaje............................................................................................................... 20
Varianty napětí a elektrické údaje...................................................................................... 20
1.varianta napětí........................................................................................................... 20
2.varianta napětí........................................................................................................... 20
Odtah................................................................................................................................. 20
Přívod vzduchu.................................................................................................................. 20
Vyrovnání potenciálů (volitelně) ......................................................................................... 20
Vypnutí při špičce (volitelně).............................................................................................. 21
Údaje přístroje ................................................................................................................... 21
Varianty upevnění .............................................................................................................. 21
Upevnění bez soklu....................................................................................................... 21
Upevnění na betonovém soklu...................................................................................... 22
Volby/příslušenství ............................................................................................................ 22
Betonový sokl (vmístě instalace) .................................................................................. 22
cs - Pokyny kinstalaci
14
edpoklady instalace
Poškození osob nebo věcné škody neodborným umístěním.
Neodborné umístění sušičky může vést ke zranění osob nebo
věcným škodám.
Sušičku smí nainstalovat a zprovoznit jen servisní služba Miele ne-
bo pověřený specializovaný prodejce.
Sušička musí být nainstalována vsouladu splatnými předpisy a
normami.
Sušičku provozujte vždy jen vdostatečně větraných místnostech,
které nejsou ohrožené mrazem.
Elektrické připojení
Elektrické připojení musí provést kvalifikovaný elektrikář.
Elektrické připojení smí být provedeno jen kelektrické instalaci
provedené podle národních zákonů, nařízení a směrnic jakož imíst-
ních ustanovení a předpisů. Kromě toho je nutno respektovat předpi-
sy dodavatelů energií a pojistitelů, bezpečnostní předpisy a uznávaná
pravidla techniky.
Spolehlivý a bezpečný provoz sušičky je zaručen pouze tehdy,
pokud je přístroj připojen kveřejné rozvodné síti.
Potřebné přípojné elektrické napětí, příkon a specifikace pro jištění
jsou uvedeny na typovém štítku sušičky. Než provedete elektrické
připojení, přesvědčte se, že přípojné napětí souhlasí snapěťovými
údaji na typovém štítku!
Při odlišných hodnotách napětí hrozí nebezpečí, že se sušička poš-
kodí příliš vysokým přípojným napětím.
Pokud je na typovém štítku uvedeno více hodnot napětí, je možné
sušičku přepnout pro připojení na příslušné vstupní napětí. Toto
přepnutí smí provést jen servisní služba Miele nebo pověřený specia-
lizovaný obchod. Při přepínání je nutno změnit zapojení kabelů podle
schématu zapojení.
Sušičku je možné elektricky připojit buď pevně, nebo přes zásuvku
podle IEC60309-1. Pro pevné připojení musí být vmístě instalace
kdispozici odpojovací zařízení odpojující všechny póly sítě.
Za odpojovací zařízení sítě se považují vypínače se vzdáleností roz-
pojených kontaktů větší než 3mm. Patří knim např. proudové
chrániče, jističe a stykače (IEC/EN60947).
Odpojovací zařízení sítě (včetně zástrčky) musí být zajištěné proti
neúmyslnému a neautorizovanému zapnutí, jestliže nelze zkaždého
přístupového místa kontrolovat trvalé přerušení přívodu energie.
cs - Pokyny kinstalaci
15
Tip: Přednostně by sušička měla být připojena na zástrčku, aby se
daly snadněji provádět zkoušky elektrické bezpečnosti (např. při
údržbě nebo opravě).
Nesmí se instalovat zařízení, která sušičku automaticky vypnou
(např. časové spínače).
Jestliže je podle místních předpisů nutné nainstalovat proudový
chránič FI (RCD), musí být povinně použit chránič typuB (citlivý na
všechny proudy).
Pokud místní a národní instalační předpisy vyžadují vyrovnání po-
tenciálů, musí být provedeno spojem sdobrým kontaktem. Vyrovnání
potenciálů musí být provedeno při svodovém proudu >10mA.
Přívod vzduchu/odtah
Sušička smí být provozována jen tehdy, když je řádně připojené od-
tahové potrubí a je postaráno odostatečné větrání místnosti.
Součásti příslušenství se smí namontovat a vestavět jen tehdy,
když jsou výslovně schválené společností Miele. Pokud budou
namontovány nebo vestavěny jiné díly, zaniká veškerá záruka nebo
ručení poskytované společností Miele.
cs - PDR922/522, elektricky vytápěné
16
Rozměry
906
1057
>20
Ø 520
650
1400
900 642
1162
67
1064
1400
20
595 Ø 630
1600
45°
>20
1162
1057
1600
906
900
< 180°
38
Rozměry vmilimetrech
cs - PDR922/522, elektricky vytápěné
17
Instalace
620 280
183
SLA
1342
305
1600
150
305
1600
~ 50
2 x
150
128
200
EL
AL ZL
PA
ZL
PA
EL
AL
128
SLA
PA
SLA
ZL
EL
AL
AL
ZL
161
160
"Z"
"Y"
"Y"
"Z"
XCI
96
31
Rozměry vmilimetrech
PL elektrický přípoj
AL přípojka odtahu
ZL přívod vzduchu
PA přípoj pro vyrovnání potenciálů (volitelně)
SLA přípoj pro vypnutí při špičce (volitelně)
XCI XCIBox/připojovací skříňka (volitelně)
cs - PDR922/522, elektricky vytápěné
18
Umístění (standard/betonový sokl)
20
1400
Ø 10
1400
BS
395
B
~ 48
55
1059
~ 55
>50
Ø 10
~ 55
B
1600
55
790
395
1066
900
534
BB
A
A
BS >1200
>55
BS >900
534
1066
B
B
BB
A - A B - B
>55
790
1600
~ 48
BS
>50
20
Rozměry vmilimetrech
Bbod upevnění/vyvrtaná díra
BS betonový sokl
cs - PDR922/522, elektricky vytápěné
19
Umístění (offshore)
20
1400
M6 x 20
B
~ 48
55
1059
1600
55
790
900
963
463
534
BB
C
C
926
OFFSHORE
C - C
BB
395
103
Rozměry vmilimetrech
Bbod upevnění/vyvrtaná díra
cs - Technické údaje
20
Varianty napětí a elektrické údaje
1.varianta napětí
standardní připojení
napájecí napětí 3N AC 400V
frekvence 50/60Hz
příkon 23,5kW
elektrické jištění (vmístě instalace) 3×50A
min. průřez připojovacího kabelu 5×10mm²
šroubovací objímka kabelu M40
2.varianta napětí
standardní připojení
napájecí napětí 3 AC 230V
frekvence 50/60Hz
příkon 23,5kW
elektrické jištění (vmístě instalace) 3×63A
min. průřez připojovacího kabelu 4×16mm²
šroubovací objímka kabelu M40
Odtah
max. jmenovitý průtok vodtahovém provozu (jen PDR9xx) 960m³/h
max. jmenovitý průtok (jen PDR5xx) 740m³/h
max. přípustná tlaková ztráta 350Pa
připojovací hrdlo, na straně přístroje (vnější průměr) 150mm
připojovací trubka, vmístě instalace (vnitřní průměr) 150mm
max. teplota odtahu 80°C
Protože relativní vlhkost vzduchu ve vedení odtahu může být až 100%, musí být vhodnými opatřeními vyloučeno, aby se do přístroje
mohl dostat zpět tekoucí kondenzát.
Přívod vzduchu
standardní připojení: přívod vzduchu zprostoru instalace
doporučený volný průřez přívodu vzduchu do místnosti:
(Odpovídá 3násobku průřezu odtahu jednoho přístroje).
531cm²
Do prostoru instalace musí být přiváděn vzduch podle odtahovaného množství.
alternativní připojení: připojení přívodu vzduchu přímo zvenku
přípojka, na straně přístroje (vnitřní průměr) 161mm
připojovací trubka, vmístě instalace (vnější průměr) 160mm
Při odstranění ochranného horního krytu se odkryjí součásti pod napětím. Zbezpečnostních důvodů musí být na centrálním sání čer-
stvého vzduchu sušičky (vminimální délce 900mm) nainstalována trubka a zajištěna 2šrouby.
Vyrovnání potenciálů (volitelně)
hrdlo svnějším závitem 10×35mm
podložky a matice M10
Příslušenství potřebné pro vyrovnání potenciálů není součástí dodávky.
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12
  • Page 13 13
  • Page 14 14
  • Page 15 15
  • Page 16 16
  • Page 17 17
  • Page 18 18
  • Page 19 19
  • Page 20 20
  • Page 21 21
  • Page 22 22
  • Page 23 23
  • Page 24 24
  • Page 25 25
  • Page 26 26
  • Page 27 27
  • Page 28 28
  • Page 29 29
  • Page 30 30
  • Page 31 31
  • Page 32 32
  • Page 33 33
  • Page 34 34
  • Page 35 35
  • Page 36 36
  • Page 37 37
  • Page 38 38
  • Page 39 39
  • Page 40 40
  • Page 41 41
  • Page 42 42
  • Page 43 43
  • Page 44 44
  • Page 45 45
  • Page 46 46
  • Page 47 47
  • Page 48 48
  • Page 49 49
  • Page 50 50
  • Page 51 51
  • Page 52 52
  • Page 53 53
  • Page 54 54
  • Page 55 55
  • Page 56 56
  • Page 57 57
  • Page 58 58
  • Page 59 59
  • Page 60 60
  • Page 61 61
  • Page 62 62
  • Page 63 63
  • Page 64 64

Miele PDR 522 TOP Installation Plan

Tip
Installation Plan
Bu kılavuz için de uygundur

Diğer dillerde