CAME SLS24 Kullanım kılavuzu

Tip
Kullanım kılavuzu

Bu kılavuz için de uygundur

ITALY
MADE IN
SLS24
W
A
R
R
A
N
T
Y
G
A
R
A
N
T
I
E
G
A
R
A
N
Z
I
A
G
A
R
A
N
T
I
A
G
A
R
A
N
T
I
E
G
A
R
A
N
T
I
E
Y
E
A
R
S
A
N
S
A
N
N
I
A
Ñ
O
S
A
N
O
J
A
H
R
E
3
Installation
manual
OPERATOR
OPERATOR
FOR
FOR
SWING GATES
SWING GATES
width of gate leaf
2.2 m max
English
Français
Italiano
Español
Português
Deutsch
Türk
2
-
FG00703M07
-
1
- 06/2017
ENGLISH
Summary
GENERAL WARNINGS ...................................................................3
KEY ..............................................................................................5
DESCRIPTION ...............................................................................5
Intended use ...........................................................5
Limits to use ...........................................................5
Technical data ..........................................................6
Dimensions ..............................................................6
Description of parts .................................................7
Standard installation ................................................8
INSTALLING ..................................................................................9
Preliminary checks ...................................................9
Checking measurements and applicative dimensions ...10
Cable type and minimum thicknesses ........................11
Preliminary works ...................................................12
Fastening the braces ...............................................13
Fastening the operator ............................................15
Establishing the limit-switch points ...........................18
CONTROL PANEL .........................................................................20
Dimensions ............................................................ 20
Main components .................................................. 21
Fastening and mounting the box .............................. 22
ELECTRICAL CONNECTIONS .........................................................23
Power supply ......................................................... 23
Electric lock ........................................................... 23
Gearmotors ........................................................... 24
Command and control devices ................................. 25
Safety devices ....................................................... 26
Signaling devices .................................................... 27
PROGRAMMING .........................................................................28
Description of programming commands .................... 28
Functions menu ..................................................... 29
SETTING UP ................................................................................34
Motor type ........................................................... 34
Number of motors ................................................. 34
Motors test .......................................................... 35
Self-learning of the gate-leaf travel .......................... 36
MANAGING USERS .....................................................................38
Adding users with an associated command ............... 38
Deleting a single user ............................................. 39
ILLUSTRATION OF THE SLOW-DOWN AND APPROACH AREAS AND
POINTS ......................................................................................40
ERROR MESSAGE ........................................................................41
FINAL OPERATIONS.....................................................................41
INWARD OPENING CONNECTIONS AND INSTALLING ....................42
Measurements and applicative dimensions ............... 42
Fastening braces and gearmotors............................ 43
Electrical connections ............................................. 43
DISMANTLING AND DISPOSAL ....................................................44
DECLARATION OF CONFORMITY ...................................................44
3
-
FG00703M07
-
1
- 06/2017
ENGLISH
This product must only be used for its speci cally intended
purpose. Any other use is dangerous. LABEL HABITAT SAS
is not liable for any damage caused by improper, wrongful
or unreasonable use of this product. • This manual's
product is de ned by machinery directive 2006/42/CE as
"partly-completed machinery". Quasi-completed machinery
is a set that almost constitutes a machine, but which,
alone, cannot ensure a clearly de ned application. Partly-
completed machinery is only destined to be incorporated or
assembled to other machinery or other partly-completed
machinery or apparatuses to build machinery that is
regulated by Directive 2006/42/CE. The nal installation
must be compliant with European directive 2006/42/CE and
European reference standards:
EN 13241-1, EN 12453, EN 12445 and EN 12635.
Given these considerations, all procedures stated in
this manual must be exclusively performed by expert,
quali ed staff.• The operator cannot be used with gates
tted with pedestrian doors, unless its operation can
be activated only when the pedestrian door is in safety
position • Make sure that people are not entrapped
between the gate's moving and xed parts due to the
gate's movement • Before installing the operator, check
that the gate is in proper mechanical conditions, that it
is properly balanced and that it properly closes: if any of
these conditions are not met, do not continue before having
met all safety requirements • Make sure that opening and
closing limiters are tted • Make sure the operator is
installed onto a sturdy surface that is protected from any
impacting shocks • Make sure that mechanical stops are
already installed • If the operator is installed lower than
2.5 from the ground or from any other access level, t any
protections and signs to prevent hazardous situations •
Do not t the operator upside down or onto elements that
could yield to its weight If necessary, add reinforcements
to the fastening points • Do not install door or gate leaves
on tilted surfaces • Check that no lawn watering devices
spray the operator with water from the bottom up •
Suitably section off and demarcate the entire installation
site to prevent unauthorized persons from entering the
CAUTION: Important safety instructions.
Follow all instructions. Improper installation may lead to serious
bodily injuries. Before continuing, alsoread the precautions in the
operating and maintenance manual.
GENERAL WARNINGS
4
-
FG00703M07
-
1
- 06/2017
ENGLISH
area, especially minors and children • Fit cautionary signs,
such as the gate plate, wherever needed and in plain sight
• Use proper protections to prevent mechanical hazards
when people are loitering around the machinery's range
of action, for example avoid crushing of ngers between
the drive shaft and the mechanical stops, avoid crushing
when the gate is opening • The electrical cables must run
through the cable glands and not touch any parts that may
overheat, such as the motor, transformer, and so on • All
command and control devices must be installed at least
1.85 m from the perimeter of the gate's range of action
or where they cannot be reached through the gate from
the outside • All switches in maintained action mode must
be positioned so that the moving gates leaves, the transit
areas and vehicle thru-ways are completely visible, and yet
the switches must be also away from any moving parts •
Unless a key switch is used, all control devices must be
tted at a height of at least 1.5 mand wherethey are not
accessible to the public • Before handing over to users,
check that the system is compliant with the 2006/42/
CEuniformed Machinery DirectiveMake sure that the
operator has been properly adjusted and that the safety
and protection devices, and the manual release, are working
properly • Af x a permanent tag, that describes how to
use the manual release mechanism, close to the mechanism
• Make sure to hand over to the end user, all operating
manuals for the products that make up the nal machinery
• Set up a suitable dual pole cut off device along the power
supply that is compliant with the installation rules. It should
completely cut off the power supply according to category III
surcharge conditions • The gearmotor must be exclusively
powered by very low safety voltage, which corresponds to
what is stated in the markings on the motor itself, and by
using the control panel supplied in the KIT.
5
-
FG00703M07
-
1
- 06/2017
0
50
100
150
200
250
300
350
0
1
1,25 1,5 1,75 2 2,25
2,2
215
ENGLISH
KEY
This symbol shows which parts to read carefully.
This symbol shows which parts describe safety issues
This symbol shows which parts to tell users about.
THE MEASUREMENTS, UNLESS OTHERWISE STATED, ARE IN MILLIMETERS. THE CONTENTS OF THIS MANUAL MAY CHANGE, AT ANY TIME, AND WITHOUT NOTICE.
DESCRIPTION
Complete system featuring control panel, device for controlling the movement and detecting obstructions plus mechanical limit-
switches for swing gates measuring up to 2.2 m in length (per leaf).
Intended use
This operator is designed to power swing gates for residential and apartment block use.
Any installation and/or use other than that speci ed in this manual is forbidden.
Gate-leaf weight (Kg)
Gate-leaf length (m)
We suggest you always
t an electrolock onto swing
gates for a more reliable
closure.
Limits to use
6
-
FG00703M07
-
1
- 06/2017





#
#
#
#
IP54
IP44
ENGLISH
Dimensions
(mm)
Technical data
SLS24 (Irreversible gearmotor) ZL92 (Control panel)
Power supply (V) 24 DC Power supply (V) 230 AC
Current draw (A) 4 max. Consumption in stand-by mode (mA) 110
Power (W) 100 Power (W) 300
Thrust (N) from 400 to 2,000 Power of 24 V (W) accessories 50 max
Cycles/hr CONTINUOUS
SERVICES Opening time at 90° (s) ADJUSTABLE
Weight (Kg) 7.5 Weight (Kg) -
Acoustic pressure level (dB (A)) 70
7
-
FG00703M07
-
1
- 06/2017
}
x 2
}
x 1
ENGLISH
Description of parts
1. Control panel
2. Gearmotor
Release hatch
4. Bolt, nut and bushing for tail brace
5. Post bracket
6. Tail brace
7. Gate bracket
8. Head brace
9. Distancer, washer and nut for head brace
8
-
FG00703M07
-
1
- 06/2017
ENGLISH
Standard installation
1. Gearmotor
2. Control panel
3. Junction boxes
4. Key-switch selector
5. Flashing light
6. Photocells
7. Photocell post
8. Mechanical stop
9. Junction pit
10. Transmitter
11. Electric lock
9
-
FG00703M07
-
1
- 06/2017
ENGLISH
Preliminary checks
Before beginning the installation, do the following:
• Make sure that, the gate structure is sturdy enough, that the hinges work ef ciently and that there is no friction between the
xed and moving parts;
make sure you have tted opening and closing mechanical gate stops;
check that the fastening points of the motors and devices are protected from
impact shocks and that the surfaces are solid enough.
set up suitable tubes and conduits for the electric cables to pass
through, making sure they are protected from any mechanical
damage.
INSTALLING
Only skilled, quali ed staff must install this product.
10
-
FG00703M07
-
1
- 06/2017
60
140
40
110 Ø 10
60
140
40
110 Ø 10
ENGLISH
Checking measurements and applicative dimensions
Check the fastening point of the gate brace and set up the post brace fastening point, while respecting the measurements shown in
the drawing and in the table.
Leaf opening arc (°) A B C
90° 130 130 60
120° 130 110 50
POST BRACE
GATE BRACE
11
-
FG00703M07
-
1
- 06/2017
ENGLISH
Cable type and minimum thicknesses
Connection cable length
< 20 m 20 < 30 m
Control board power supply 230 V AC (1P+N) 2 x 1.5 mm22 x 2.5 mm2
24 V DC gearmotor 3 x 1.5 mm23 x 2.5 mm2
Electric lock 2 x 0.5 mm2
Flashing light 2 x 0.5 mm2
Command and control devices 2 x 0.5 mm2
TX Photocells 2 x 0.5 mm2
RX photocells 4 x 0.5 mm2
When operating at 230 V and outdoors, use H05RN-F-type cables that are 60245 IEC 57 (IEC) compliant; whereas indoors, use
H05VV-F-type cables that are 60227 IEC 53 (IEC) compliant. For power supplies up to 48 V, you can use FROR 20-22 II-type cables
that comply with EN 50267-2-1 (CEI).
If cable lengths differ from those specified in the table, establish the cable sections depending on the actual power draw of the
connected devices and according to the provisions of regulation CEI EN 60204-1.
For multiple, sequential loads along the same line, the dimensions on the table need to be recalculated according to the actual
power draw and distances. For connecting products that are not contemplated in this manual, see the literature accompanying said
products
12
-
FG00703M07
-
1
- 06/2017
ENGLISH
Preliminary works
The following illustrations are mere examples in that the space for fastening the operator and accessories varies depending on
the installation area. It is up to the tter, therefore, to choose the most suitable solution.
The gures below refer to a standard installation with gearmotor tted on the left and gate opening inward. Installing the
gearmotor on the right is symmetrical.
Warning! For outward opening gate leaves, follow the chapter titled "INSTALLING AND CONNECTING FOR OUTWARD OPENING".
Set up junction boxes tted with cable glands and corrugated conduits for the connections coming form the junction pit.
The number of tubes depends on the type of system and the accessories you are going to t.
Lay the electrical cables (see the table on types of cables and minimum thicknesses) by running them through the corrugated
conduits and junction boxes.
13
-
FG00703M07
-
1
- 06/2017
54
720
ENGLISH
Fastening the braces
On metal posts and leaves, mark the fastening points for the tail and head braces.
The fastening measurements are listed in the paragraph titled CHECKING MEASUREMENTS AND APPLICATIVE DIMENSIONS.
Weld the braces directly onto the post and the gate leaf.
Head brace
Tail brace
14
-
FG00703M07
-
1
- 06/2017
110
40
54
110
4
0
ENGLISH
On non metal posts and leaves, assemble and weld the braces.
Mark the brace fastening points (post and gate).
The fastening measurements are listed in the paragraph titled CHECKING MEASUREMENTS AND APPLICATIVE DIMENSIONS.
Drill the anchoring points, fit the dowels or use plugs that will hold fast the screws.
Gate bracket
Head brace
Post bracket
Tail brace
15
-
FG00703M07
-
1
- 06/2017
UNI 5737 8x35
UNI 5588 M8
ENGLISH
Fastening the operator
Fit the bushing (lubricated) into the post brace hole.
The brace is pre-drilled to vary the gate-opening angle.
Fasten the gearmotor's jointed-tail to the brace by using the supplied bolt and nut.
BUSHING
16
-
FG00703M07
-
1
- 06/2017
ENGLISH
Loosen the screws on the mechanical stops.
Fit the distances on the head attaching pin as shown in the drawing.
DISTANCER
17
-
FG00703M07
-
1
- 06/2017
UNI 7474 M12
ENGLISH
Open the leaf, fit the gearmotor attaching pin in to the eyelet hole on the head brace and fasten it by using the supplied washer and nut.
WASHER Ø26
18
-
FG00703M07
-
1
- 06/2017
ENGLISH
Establishing the limit-switch points
Release the gearmotor.
When opening.
Entirely open the gate leaf. Place the opening-thrust mechanical stop with the attachment pin and fasten it.
19
-
FG00703M07
-
1
- 06/2017
ENGLISH
When closing.
Close the leaf. Place the closing-thrust mechanical stop with the attachment pin and fasten it.
20
-
FG00703M07
-
1
- 06/2017
295
320
215 240 145
120
ENGLISH
CONTROL PANEL
Warning! Before working on the control panel, cut off the main current supply and, if present, remove any batteries.
The control panel features an ABS casing with a fully opening hatch door which can fit hinges either to the left or to the right. Inside is
fitted the control board complete with radio receiver board and transformer.
We suggest installing it in an area that is protected from any impact shocks and possible tampering.
All connections are quick-fuse protected.
FUSES
- Line 1.6 A-F = 230 V
- Control board 1 A-F
- Motor 1 / Motor 2 6.3 A = 250 V
- Accessories 2 A-F
Dimensions
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12
  • Page 13 13
  • Page 14 14
  • Page 15 15
  • Page 16 16
  • Page 17 17
  • Page 18 18
  • Page 19 19
  • Page 20 20
  • Page 21 21
  • Page 22 22
  • Page 23 23
  • Page 24 24
  • Page 25 25
  • Page 26 26
  • Page 27 27
  • Page 28 28
  • Page 29 29
  • Page 30 30
  • Page 31 31
  • Page 32 32
  • Page 33 33
  • Page 34 34
  • Page 35 35
  • Page 36 36
  • Page 37 37
  • Page 38 38
  • Page 39 39
  • Page 40 40
  • Page 41 41
  • Page 42 42
  • Page 43 43
  • Page 44 44
  • Page 45 45
  • Page 46 46
  • Page 47 47
  • Page 48 48
  • Page 49 49
  • Page 50 50
  • Page 51 51
  • Page 52 52
  • Page 53 53
  • Page 54 54
  • Page 55 55
  • Page 56 56
  • Page 57 57
  • Page 58 58
  • Page 59 59
  • Page 60 60
  • Page 61 61
  • Page 62 62
  • Page 63 63
  • Page 64 64
  • Page 65 65
  • Page 66 66
  • Page 67 67
  • Page 68 68
  • Page 69 69
  • Page 70 70
  • Page 71 71
  • Page 72 72
  • Page 73 73
  • Page 74 74
  • Page 75 75
  • Page 76 76
  • Page 77 77
  • Page 78 78
  • Page 79 79
  • Page 80 80
  • Page 81 81
  • Page 82 82
  • Page 83 83
  • Page 84 84
  • Page 85 85
  • Page 86 86
  • Page 87 87
  • Page 88 88
  • Page 89 89
  • Page 90 90
  • Page 91 91
  • Page 92 92
  • Page 93 93
  • Page 94 94
  • Page 95 95
  • Page 96 96
  • Page 97 97
  • Page 98 98
  • Page 99 99
  • Page 100 100
  • Page 101 101
  • Page 102 102
  • Page 103 103
  • Page 104 104
  • Page 105 105
  • Page 106 106
  • Page 107 107
  • Page 108 108
  • Page 109 109
  • Page 110 110
  • Page 111 111
  • Page 112 112
  • Page 113 113
  • Page 114 114
  • Page 115 115
  • Page 116 116
  • Page 117 117
  • Page 118 118
  • Page 119 119
  • Page 120 120
  • Page 121 121
  • Page 122 122
  • Page 123 123
  • Page 124 124
  • Page 125 125
  • Page 126 126
  • Page 127 127
  • Page 128 128
  • Page 129 129
  • Page 130 130
  • Page 131 131
  • Page 132 132
  • Page 133 133
  • Page 134 134
  • Page 135 135
  • Page 136 136
  • Page 137 137
  • Page 138 138
  • Page 139 139
  • Page 140 140
  • Page 141 141
  • Page 142 142
  • Page 143 143
  • Page 144 144
  • Page 145 145
  • Page 146 146
  • Page 147 147
  • Page 148 148
  • Page 149 149
  • Page 150 150
  • Page 151 151
  • Page 152 152
  • Page 153 153
  • Page 154 154
  • Page 155 155
  • Page 156 156
  • Page 157 157
  • Page 158 158
  • Page 159 159
  • Page 160 160
  • Page 161 161
  • Page 162 162
  • Page 163 163
  • Page 164 164
  • Page 165 165
  • Page 166 166
  • Page 167 167
  • Page 168 168
  • Page 169 169
  • Page 170 170
  • Page 171 171
  • Page 172 172
  • Page 173 173
  • Page 174 174
  • Page 175 175
  • Page 176 176
  • Page 177 177
  • Page 178 178
  • Page 179 179
  • Page 180 180
  • Page 181 181
  • Page 182 182
  • Page 183 183
  • Page 184 184
  • Page 185 185
  • Page 186 186
  • Page 187 187
  • Page 188 188
  • Page 189 189
  • Page 190 190
  • Page 191 191
  • Page 192 192
  • Page 193 193
  • Page 194 194
  • Page 195 195
  • Page 196 196
  • Page 197 197
  • Page 198 198
  • Page 199 199
  • Page 200 200
  • Page 201 201
  • Page 202 202
  • Page 203 203
  • Page 204 204
  • Page 205 205
  • Page 206 206
  • Page 207 207
  • Page 208 208
  • Page 209 209
  • Page 210 210
  • Page 211 211
  • Page 212 212
  • Page 213 213
  • Page 214 214
  • Page 215 215
  • Page 216 216
  • Page 217 217
  • Page 218 218
  • Page 219 219
  • Page 220 220
  • Page 221 221
  • Page 222 222
  • Page 223 223
  • Page 224 224
  • Page 225 225
  • Page 226 226
  • Page 227 227
  • Page 228 228
  • Page 229 229
  • Page 230 230
  • Page 231 231
  • Page 232 232
  • Page 233 233
  • Page 234 234
  • Page 235 235
  • Page 236 236
  • Page 237 237
  • Page 238 238
  • Page 239 239
  • Page 240 240
  • Page 241 241
  • Page 242 242
  • Page 243 243
  • Page 244 244
  • Page 245 245
  • Page 246 246
  • Page 247 247
  • Page 248 248
  • Page 249 249
  • Page 250 250
  • Page 251 251
  • Page 252 252
  • Page 253 253
  • Page 254 254
  • Page 255 255
  • Page 256 256
  • Page 257 257
  • Page 258 258
  • Page 259 259
  • Page 260 260
  • Page 261 261
  • Page 262 262
  • Page 263 263
  • Page 264 264
  • Page 265 265
  • Page 266 266
  • Page 267 267
  • Page 268 268
  • Page 269 269
  • Page 270 270
  • Page 271 271
  • Page 272 272
  • Page 273 273
  • Page 274 274
  • Page 275 275
  • Page 276 276
  • Page 277 277
  • Page 278 278
  • Page 279 279
  • Page 280 280
  • Page 281 281
  • Page 282 282
  • Page 283 283
  • Page 284 284
  • Page 285 285
  • Page 286 286
  • Page 287 287
  • Page 288 288
  • Page 289 289
  • Page 290 290
  • Page 291 291
  • Page 292 292
  • Page 293 293
  • Page 294 294
  • Page 295 295
  • Page 296 296
  • Page 297 297
  • Page 298 298
  • Page 299 299
  • Page 300 300
  • Page 301 301
  • Page 302 302
  • Page 303 303
  • Page 304 304
  • Page 305 305
  • Page 306 306
  • Page 307 307
  • Page 308 308

CAME SLS24 Kullanım kılavuzu

Tip
Kullanım kılavuzu
Bu kılavuz için de uygundur